Week of Nov 22:
Steel detailing at gymnasium
Connector steel erection
Block walls around south elevation
Shoring for elevated slab at garage
Prep work for existing building circulation/elevator/stairs
Next Week
Steel detailing
Block walls around gymnasium
Pour concrete for elevated slab at garage
Site grading